Shop drawing management software

Shop drawing management software for submittal review

Shop drawings move fast and change often. BuildRevu keeps each drawing on one numbered record, tracks each revision in sequence, and captures the review markups and the approval code that governs it.

Typical shop drawing problems

  • A contractor resubmits before the previous revision has been decided.
  • Redlines are made on a downloaded copy that never returns to the register.
  • Several reviewers give different codes and nobody knows which one applies.
  • Fabrication starts against a revision that was only approved with comments.

How the review runs

Submission against a document number

Contractors submit into an existing numbered record, so revisions accumulate in one place.

In-browser PDF redlining

Clouds, arrows, text notes and threaded comment pins, saved on the revision rather than on a local copy.

Reviewer allocation by discipline

Reviewers are allocated per revision, with the responsible manager recording the governing decision.

Worst status wins

Where reviewers disagree, the most conservative outcome governs the revision.

Resubmission gate

A new revision cannot be opened while the previous one is still under review.

Stamped reviewed copy

Download the redlined copy with a QR stamp — blue for approved outcomes, red for revise and resubmit or rejected.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

Common questions

What do the A, B, C and D codes mean?
A is approved, B is approved with comments, C is revise and resubmit and D is rejected. Where more than one reviewer responds, the most conservative code governs.
Can we submit CAD files alongside the PDF?
Yes. A PDF is required for review, and DWG or model files can be submitted with it and downloaded by reviewers.
Are markups preserved after approval?
Yes. Once a revision closes, its markups and decisions are locked and remain downloadable as a stamped copy.

Share this page

Want a workspace for your project?