Built in Dubai for UAE delivery teams

Construction management software for UAE projects

BuildRevu gives clients, PMCs, consultants and contractors in Dubai, Abu Dhabi, Sharjah and the Northern Emirates one auditable record, from the first shop drawing to final handover. Projects run in AED by default, follow FIDIC practice and keep working on site with no signal.

What slows UAE projects down

  • Approvals scattered across email and WhatsApp, with no clear current revision when the consultant asks.
  • FIDIC notice periods missed because letters, instructions and claims live in separate folders.
  • Fast-track towers where progress, manpower and BOQ quantities are reported in different spreadsheets.
  • Handover to the client and facility manager delayed while as-builts and O&M manuals are gathered at the last minute.

How BuildRevu supports UAE projects

Document control with A/B/C/D codes

Shop drawings, material submittals, RFIs, WIRs and MIRs move through reviewer opinions and a manager decision, with sequential R0, R1, R2 revisions.

FIDIC commercial workflows

Variations, interim payment certificates, claims and contractual time limits, with retention, advance recovery and VAT in AED.

Per-client numbering

Reference numbers follow the format each client or developer requires, without changing numbers already issued.

Progress against the approved plan

Planned versus actual, earned value and a floor-by-trade Progress Matrix built from BOQ quantities.

Quality, HSE and snags

Inspection and test plans with hold and witness points, incident registers and snag lists captured on site, even offline.

Handover and close-out

As-built registers, warranties and close-out documents collected as the work finishes, not after it.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

UAE questions

Is BuildRevu based in the UAE?
Yes. BuildRevu is operated by AEAS Concept Project Management Services, Office No. 202, Pinnacle Building, Al Barsha First, Dubai.
Can projects be run in AED?
Yes. AED is the default project currency, and each project can use another currency if the contract requires it.
Does it follow FIDIC?
Commercial records follow FIDIC practice: engineer's instructions, variations, payment certificates, claims and contractual notice periods.
Does it work on site without signal?
Yes. The installed app keeps working offline and sends saved site records once the device reconnects.

Share this page

Want a workspace for your project?