Construction document management software

Construction document management software with a controlled register

Document control fails when the register, the review and the decision live in three different places. BuildRevu holds the document number, every revision, the comments and the final status on one record.

What email and spreadsheets cannot do

  • Two people hold different files that both claim to be the current revision.
  • Revision history is spread across message threads and cannot be reconstructed.
  • There is no record of who reviewed a submission, or on which version they commented.
  • Nothing prevents a new revision being issued while the last one is still under review.

How document control works

Immutable document numbers

Numbers follow a standard project-organization-type-discipline-serial format and never change once issued.

Sequential revisions

R0, R1, R2 in order, with a database-level gate on opening a new revision before the current one closes.

Reviewer opinions kept separate

Reviewers record their opinion; the responsible manager records the decision. Both are stored, with who, when and on which file.

A/B/C/D outcomes

Approved, approved with comments, revise and resubmit, or rejected — with the most conservative outcome governing where several reviewers disagree.

Discipline and status filters

Filter the register by organization, document type, discipline and status to see exactly what is outstanding.

Stamped and verifiable copies

Download the submitted file, the redlined reviewed copy and a close-out report, each carrying a QR code back to the record.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

Common questions

What is construction document control?
It is the discipline of making sure every drawing and document has one identifier, one current revision and a recorded approval decision, so the project can always prove what was issued and what was approved.
Can we import an existing document register?
Yes. Registers can be imported from multi-sheet Excel files and exported again for reporting.
Are approvals auditable?
Every reviewer opinion and manager decision is stored against the revision it relates to and cannot be edited once the revision is closed.

Share this page

Want a workspace for your project?