Construction project management platform

Construction project management, from first drawing to final handover.

BuildRevu connects document control, progress, quality, health and safety, commercial cost control and handover in one auditable workspace for clients, consultants and contractors.

New customers can create a workspace. Project members join through a secure invitation. Contact sales for rollout support.

One connected project lifecycle

DOCUMENTSPROGRESSQUALITYHEALTH & SAFETYCOMMERCIALHANDOVER

Project setup → documents and communication → progress and site records → quality and safety control → commercial and cost control → commissioning and handover.

What you get

Six connected workspaces plus 360° site capture, supported by shared permissions, notifications, reports and audit history.

01

Documents and drawings

Drawings, models, documents and correspondence stay connected to their decisions.

Controlled register

Approved submission lists with immutable document numbers built from the project and organisation codes, matched by file naming.

Revision control

R0, R1, R2… in strict sequence. A new revision only opens once the previous one carries a recorded decision.

Redline review

Mark up drawings in the browser with clouds, arrows, text, measurements and threaded comments, then export a flattened PDF.

A/B/C/D decisions

Reviewers give opinions, managers give the decision — and where several managers decide, the worst status governs.

02

Progress

Turn approved programmes and site records into a reliable view of delivery.

Programme control

Submit baseline, revised and mitigation programmes for Consultant review, then track activity achievement against the live revision.

Manpower and equipment

Compare approved deployment plans with shift-aware site logs, working calendars and current resource shortfalls.

Quantities and site records

Record BOQ-aligned daily quantities, analyse by period, floor and item, and retain date-based registers.

Professional progress reports

Generate weekly and monthly reports with programme status, resource shortfalls, selected photo folders and QR verification.

360° reality capture

Pin dated 360° photos or video to floor plans, compare visits, link visible issues to live records, export reports and share expiring read-only tours.

03

Quality

Plan inspections and control WIR, MIR, NCR, SOR and snags in one workspace.

Inspections with checklists

Work and material inspections cannot be submitted until every checklist line is answered, with a comment on each failure.

NCR and SOR

Non-conformance and site observation reports issued to an organisation, answered with a corrective action, closed on accepted evidence.

Snagging and de-snagging

Snags raised organisation to organisation, assigned by the receiving QA/QC Manager, with before and after photos on every item.

Closure by approval

Closure is requested, endorsed by the receiving QA/QC Manager, then approved by the raiser — never closed by the person who fixed it alone.

04

Health & safety

Keep risks, permits, corrective actions and worker compliance visible.

HSE command centre

Monitor active hazards, days without lost-time injury, open permits, overdue actions and recent incidents.

Permits to work

Route risk-assessed permits to the reviewing organisation's HSE Manager and track live permits by work zone.

Incidents, hazards and CAPA

Link corrective actions to hazards, incidents and audits, track them on a board or register, and escalate overdue work into meetings.

Audits and worker compliance

Run reusable safety checklists and monitor induction, medical, training and trade certificates.

05

Commercial & cost

Control the budget, variations, payment certificates and contractual claims on one record.

Cost plan and contracts

The cost consultant uploads the budget by trade and cost code from Excel; the lead consultant reviews and the client approves the live revision.

Variation orders

Raised by the contracting party, assessed by the QS with recommended amount and days, then approved by the client and reflected in the forecast.

Payment certificates

Interim applications with retention, advance recovery and VAT, certified by the QS and tracked through client approval to payment.

Notices and claims

FIDIC 28-day notice countdowns, claims linked to their notice, evidence from progress and quality records, and delay impact against the baseline.

06

Handover & close-out

Know what is ready, what is missing and what still blocks handover.

Close-out readiness

See assets handed over, required documents approved, open snags and non-conformances, warranties and the defects period.

Asset and warranty register

Track asset tags, systems, locations, suppliers, serial numbers, installation dates and warranty expiry.

O&M and commissioning

Control required manuals, certificates, as-builts and training records, then complete witnessed commissioning checklists.

Handover pack

Export a structured close-out workbook from the live asset, document and readiness registers.

Built for multi-discipline construction delivery teams

“A 40-story residential tower uses BuildRevu to keep its controlled project record in one place.”

How it works

01

Set up the project and team

Create the workspace, add project organisations and invite people into defined roles and module permissions.

02

Control documents and communication

Manage drawings, revisions, correspondence, reviews and formal decisions in connected registers.

03

Manage delivery on site

Track programme, manpower, quantities, equipment, photographs, quality and safety using approved records.

04

Assure and hand over

Close quality and safety actions, commission assets and export a traceable handover pack.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

Built around how projects actually run

Project Managers, planners, quantity surveyors, QA/QC, HSE, document controllers, consultants, clients and contractors work from the same approved project position. Each person sees only the projects and responsibilities assigned to them.

More about BuildRevu

Controls across every module

  • Role-scoped access and formal approvals
  • Action notifications and clear ownership
  • Live dashboards from approved project data
  • Downloadable and QR-verifiable records

The same permission, audit and reporting principles run from project setup through final handover.

Ready to run the whole project in one place?

Start a free trial, explore the tutorial, or talk to us about your rollout.

Common questions

See all questions