Construction project management software

Construction project management software for delivery teams

BuildRevu keeps documents, programme, resources, quantities, quality, safety and handover records in one workspace, with every review and decision attached to its source record.

Why projects lose the thread

  • The approved revision of a drawing lives in somebody's inbox rather than a register.
  • Reviewer opinions and the manager's decision get mixed together, so nobody can prove who approved what.
  • Inspection requests, instructions and non-conformance reports each sit in a different tool or spreadsheet.
  • When a question is raised two years later, the audit trail has to be reconstructed by hand.

What BuildRevu manages

Controlled document register

Immutable document numbers, sequential revisions and a gate that stops a new revision while the previous one is still open.

Submittals and reviews

Drawings, models, technical and sample submittals, risk assessments and reports, each routed to the reviewers allocated for that discipline.

RFIs, instructions and records

RFIs, engineer's and site instructions, memoranda, non-conformance reports and site observation reports in one feed.

Inspections with checklists

Work and material inspection requests require a completed checklist before they can be submitted.

Snagging and de-snagging

Raise snags between organizations, assign them to responsible people and route closure through QA/QC approval.

QR-verified reports

Close-out reports and stamped copies carry a QR code so anyone holding a printout can confirm it against the live record.

Progress and site records

Approved programmes, manpower, equipment, quantities, calendars, photographs and resource shortfalls feed precise weekly and monthly reporting.

HSE and handover

Hazards, permits, corrective actions and audits connect to asset, O&M, commissioning and close-out readiness records.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

Common questions

Who is BuildRevu construction project management software for?
Clients, consultants, sub-consultants, main contractors, sub-contractors and document controllers working on the same project, each with access scoped to their organization and role.
Does it replace our document controller?
No. It gives the document controller the register, numbering rules and approval groups to work with, and removes the manual chasing that sits around them.
Can we try it before committing?
Yes — the interactive demo walks through the full workflow with no signup, and new customers can start a 30-day workspace trial.

Share this page

Want a workspace for your project?