Construction handover software

Construction handover software for close-out, O&M and commissioning

Handover is where a project's records are finally tested. BuildRevu builds the close-out pack from the approved records already in the project, rather than from a last-minute chase.

Why close-out drags on for months

  • The O&M manual is assembled at the end from documents nobody can locate.
  • Asset lists, test certificates and warranties live with different subcontractors.
  • Outstanding snags and open inspections are discovered during the handover walk.
  • Defects liability obligations are forgotten once the team demobilises.

What close-out covers

Close-out readiness

A live readiness position showing what is complete and what still blocks handover across documents, quality, safety and commissioning.

Asset register

Tagged assets with location, system, make and model, linked to their approved submittals and inspection records.

O&M requirements

Define what the manual must contain per asset or system, then track each requirement to received and accepted.

Commissioning records

Testing and commissioning results held against the asset, with witnessing and acceptance recorded.

Warranties and defects liability

Warranty start and expiry dates with defects liability period tracking, so obligations stay visible after completion.

Handover pack export

Export the close-out pack with the asset register, O&M status and commissioning evidence, QR-verified against the live record.

Inside BuildRevu

See it in action

Project summary

Riverside Residences · Current approved position

Updated today

Documents

124

8 in review

Progress

4.0%

4.5% planned

Quality

11

open records

Health & safety

2

active hazards

Commercial

98%

of approved budget

Handover

76%

ready

Controlled drawings · current revisions

Document NumberRevisionStatusDisciplineLast Updated
BRV-ARC-DRG-0042R2AArchitecture04 Sep 2026
BRV-STR-DRG-0118R1BStructural03 Sep 2026
BRV-MEP-SUB-0073R2CMEP02 Sep 2026
BRV-CIV-DRG-0029R0DCivil31 Aug 2026
BRV-ARC-DRG-0042 · R2Level 12 plan
DRAWING PREVIEW · 1 OF 4

Start with the whole project position, then open the exact workspace behind each figure. Documents retain their revision, redline and approval history; progress, quality, safety and handover use the same controlled-record principle.

Common questions

Does the handover pack reuse approved project records?
Yes. Assets, inspections, submittals and commissioning records already approved in the project feed the close-out pack directly.
Can the client see close-out progress during construction?
Yes. Client and asset teams can follow readiness, commissioning and outstanding items throughout, not only at the end.
Is the defects liability period tracked after handover?
Yes. Warranty and defects liability dates stay on the asset record so expiring obligations are visible.

Share this page

Want a workspace for your project?