Full product tutorial

Follow a construction project from first drawing to final handover

Explore the current project summary, document control, progress, 360° reality capture, quality, HSE, commercial cost control, handover and administration workspaces using one fictional project. The tour is open — nothing to install and no sign-in needed.

5 / 34

Project 40218

Marina Towers — Residential

Documents
  • 40218-NBC-ST-DWG-0104Tower A — Raft foundation layoutStructural · submitted 12 AugR1Approved entryA Approved
  • 40218-NBC-ST-DWG-0118Tower A — Core wall reinforcementStructural · submitted 19 AugR2Approved entryB Approved with comments
  • 40218-NBC-AR-DWG-0231Podium level — Finishes scheduleArchitectural · submitted 26 AugR0Approved entry• Under review
  • 40218-NBC-ME-DWG-0402Basement — Ventilation ductworkMechanical · submitted 24 AugR1Approved entryC Revise & resubmit
  • 40218-NBC-EL-DWG-0511Tower B — Lighting layoutElectrical · submitted 21 AugR0Approved entryD Rejected
  • 40218-NBC-AR-DWG-0288Tower B — Typical unit layoutsArchitectural · nothing submitted yet—Pending approvalNot submitted

Revision history — 40218-NBC-ST-DWG-0118

  1. R0
    C Revise & resubmitsubmitted 02 Aug

    Rebar spacing not coordinated with the MEP penetrations. Revise and resubmit.

    S. Verma — Team Manager (Consultant)

  2. R1
    B Approved with commentssubmitted 19 Aug

    Approved with comments — update the bar bending schedule on the next issue.

    S. Verma — Team Manager (Consultant)

  3. R2
    • Under reviewsubmitted 28 Aug

    Two reviewer opinions recorded; decision still open.

    Awaiting Team Manager

A new revision only opens once the previous one carries a recorded decision — so R2 could not exist before R1 was signed off.

A

Approved

No comments. Good for construction.

B

Approved with comments

Proceed, resolve comments on next issue.

C

Revise & resubmit

Closes the revision, opens the next one.

D

Rejected

Submission is not acceptable as issued.

What the demo shows

The tutorial follows the same structure and terminology as the working product, from project setup and controlled records through site delivery, assurance and handover.

Project summary and team

A concise project position, action queue, organisation directory and module permissions for every team member.

Document control

Drawings, models, revisions, correspondence, redlines and formal decisions in connected registers.

Progress and site records

Approved programmes, resources, quantities, dated 360° floor-plan capture, comparisons and QR-verified reports.

Quality (QA/QC)

ITPs, WIR, MIR, NCR, SOR and snag close-out with mandatory checks, evidence and approvals.

Health and safety

Incidents, hazards, permits, corrective actions, safety audits and worker certification from one command centre.

Commercial and cost control

Cost plan baselines, contracts, variations, payment certificates and FIDIC notices and claims with delay impact.

Handover and close-out

Readiness, assets, O&M records, warranties, commissioning checklists and the final handover pack.

Who the tour is for

Project managers

See how each delivery function contributes to one accurate project position and action queue.

Consultants and clients

Follow programme, document, quality and handover reviews through defensible approval trails.

Contractors and site teams

See how programme, resources, quantities, inspections, safety records and photographs stay aligned.

QA/QC and HSE teams

Use checklists, permits, audits, corrective actions and approval gates without separate spreadsheets.

Planners and quantity surveyors

Check live programmes, deployment plans, approved logs, BOQ quantities and resource shortfalls.

Commercial and contracts teams

Follow cost plans, variations, payment certificates, notices and claims through their contractual approval routes.

After the tour

Start a 30-day trial for a new workspace, or accept a secure invitation to join an existing organisation and project.