Full product tutorial

Follow a construction project from first drawing to final handover

Explore the current project summary, document control, progress, 360° reality capture, quality, HSE, commercial cost control, handover and administration workspaces using one fictional project. The tour is open — nothing to install and no sign-in needed.

19 / 34
CommunicationsInspections (WIR / MIR)

Type

All types▾

Status

Needs my action▾

Organization

All organizations▾
Download summary PDF
  • RFI

    Clarification on core wall opening at level 6

    A. Khan — Northbay Construction

    Your opinion neededUnder review
  • CR

    Relocate riser access panel at level 6

    A. Khan — Northbay Construction

    Your opinion neededUnder review
  • EI

    Revised balcony balustrade specification

    R. Fernandes — Marina Development Co.

    A — Approved
  • WIR

    Level 4 slab — pre-pour reinforcement inspection

    M. Doshi — Northbay Construction

    B — Approved with comments
  • MIR

    Chilled water pipe material approval

    T. Nair — Northbay Construction

    C — Revise & resubmit
  • MEMO

    Site access restrictions during crane erection

    R. Fernandes — Marina Development Co.

    A — Approved
  • NCR

    Concrete cover below specification at level 4 slab, grid C4-C5

    S. Verma — Apex Consult

    Your opinion neededUnder review
  • SOR

    Housekeeping observation — material stacked in escape route

    R. Fernandes — Marina Development Co.

    B — Approved with comments
  • SI

    Site instruction — proceed with revised balustrade fixing detail

    R. Fernandes — Marina Development Co.

    A — Approved

Non-conformance reports and site observation reports sit in the same register with their own references. Each one is issued to an organisation, answered with a corrective action, and closed only when the issuer accepts the closure evidence.

40218-NBC-RFI-0042 · raised 27 Aug · due 03 Sep

Clarification on core wall opening at level 6

Reviewer opinions

P. IyerB — Approved with comments28 Aug, 10:14

Reviewer — Structural (Consultant)

Opening size is acceptable, but add a lintel detail and reference the structural note SN-12.

L. MathewsC — Revise & resubmit28 Aug, 14:02

Reviewer — MEP (Sub-consultant)

Opening clashes with the riser route. Coordinate before the decision is issued.

Final decisionC — Revise & resubmit29 Aug, 09:30

S. Verma · Team Manager — Consultant

Worst status across managers governs: the MEP clash stands, so the item returns for coordination.

What the demo shows

The tutorial follows the same structure and terminology as the working product, from project setup and controlled records through site delivery, assurance and handover.

Project summary and team

A concise project position, action queue, organisation directory and module permissions for every team member.

Document control

Drawings, models, revisions, correspondence, redlines and formal decisions in connected registers.

Progress and site records

Approved programmes, resources, quantities, dated 360° floor-plan capture, comparisons and QR-verified reports.

Quality (QA/QC)

ITPs, WIR, MIR, NCR, SOR and snag close-out with mandatory checks, evidence and approvals.

Health and safety

Incidents, hazards, permits, corrective actions, safety audits and worker certification from one command centre.

Commercial and cost control

Cost plan baselines, contracts, variations, payment certificates and FIDIC notices and claims with delay impact.

Handover and close-out

Readiness, assets, O&M records, warranties, commissioning checklists and the final handover pack.

Who the tour is for

Project managers

See how each delivery function contributes to one accurate project position and action queue.

Consultants and clients

Follow programme, document, quality and handover reviews through defensible approval trails.

Contractors and site teams

See how programme, resources, quantities, inspections, safety records and photographs stay aligned.

QA/QC and HSE teams

Use checklists, permits, audits, corrective actions and approval gates without separate spreadsheets.

Planners and quantity surveyors

Check live programmes, deployment plans, approved logs, BOQ quantities and resource shortfalls.

Commercial and contracts teams

Follow cost plans, variations, payment certificates, notices and claims through their contractual approval routes.

After the tour

Start a 30-day trial for a new workspace, or accept a secure invitation to join an existing organisation and project.