Full product tutorial

Follow a construction project from first drawing to final handover

Explore the current project summary, document control, progress, 360° reality capture, quality, HSE, commercial cost control, handover and administration workspaces using one fictional project. The tour is open — nothing to install and no sign-in needed.

15 / 34

Reality capture · Tower A · Level 12

Dated visual site record

20 Sep 2026 Share tour
Floor layout3 camera points
P-01 · Lift lobby
P-02 · Apartment 1204
P-03 · East corridor
View direction 084°

P-02 · Apartment 1204

360° photo · captured 20 Sep

Snag SN-014Open
HSE-008In hand
PDF reportReady

What the demo shows

The tutorial follows the same structure and terminology as the working product, from project setup and controlled records through site delivery, assurance and handover.

Project summary and team

A concise project position, action queue, organisation directory and module permissions for every team member.

Document control

Drawings, models, revisions, correspondence, redlines and formal decisions in connected registers.

Progress and site records

Approved programmes, resources, quantities, dated 360° floor-plan capture, comparisons and QR-verified reports.

Quality (QA/QC)

ITPs, WIR, MIR, NCR, SOR and snag close-out with mandatory checks, evidence and approvals.

Health and safety

Incidents, hazards, permits, corrective actions, safety audits and worker certification from one command centre.

Commercial and cost control

Cost plan baselines, contracts, variations, payment certificates and FIDIC notices and claims with delay impact.

Handover and close-out

Readiness, assets, O&M records, warranties, commissioning checklists and the final handover pack.

Who the tour is for

Project managers

See how each delivery function contributes to one accurate project position and action queue.

Consultants and clients

Follow programme, document, quality and handover reviews through defensible approval trails.

Contractors and site teams

See how programme, resources, quantities, inspections, safety records and photographs stay aligned.

QA/QC and HSE teams

Use checklists, permits, audits, corrective actions and approval gates without separate spreadsheets.

Planners and quantity surveyors

Check live programmes, deployment plans, approved logs, BOQ quantities and resource shortfalls.

Commercial and contracts teams

Follow cost plans, variations, payment certificates, notices and claims through their contractual approval routes.

After the tour

Start a 30-day trial for a new workspace, or accept a secure invitation to join an existing organisation and project.